A considered process. A carefully finished bathroom.
Design, installation and every stage in between, coordinated around your home, your choices and an agreed scope.

Care for your home is part of the work.
Protected access routes. Professional M-class vacuum equipment. An organised work area and daily tidying. Some dust is inevitable during a renovation; we take practical steps to control it and limit its spread.
Before installation begins.
First conversation
We confirm your location, requirements and timing, then discuss likely costs. Sharing a budget range is optional. If the indicative price suits you, we arrange the free visit.
Visit and measurements
We measure the room, discuss your preferences and assess visible installations. Moving a toilet, shower or basin can add pipework and drainage costs, which we explain alongside the layout options.
Your proposal
Your detailed quotation defines the work, products, customer-supplied items, waste removal and exclusions. One initial concept is shown in two rendered views. Extended design is available if you want to compare alternatives.
Planning and preparation
Before work starts, we agree the renovation scope, selections, deliveries, expected schedule and payment stages. We discuss access, protection and when the bathroom will be unavailable. During the work, we keep you informed of progress and any issues.
The work behind a beautiful bathroom.
Explore each stage below. The precise order is adapted to your bathroom, selected products and construction.

Design inspiration · Details worth planning
5.1Protecting your home and removing the old bathroom
Protection and tidy working start before removal.
Protecting your home and removing the old bathroom
Protection and tidy working start before removal.
We protect the agreed route through your home with floor-protection rolls, secured appropriately for the surface. This helps protect floors while materials and waste are carried in and out.
The fittings and finishes included in the renovation are removed carefully. Tools and materials stay organised, waste is removed regularly, and the work area and access route are tidied at the end of each working day.
Professional M-class vacuum equipment helps collect construction dust. Where tools and attachments are compatible, extraction can collect dust at source. Appropriate protection and regular cleaning help limit its spread; demolition and preparation will still generate some dust.
5.2Inspecting what is behind the finishes
We assess the surfaces and installations exposed during removal.
Inspecting what is behind the finishes
We assess the surfaces and installations exposed during removal.
Old tiles can conceal loose mortar, unsuitable surfaces, moisture damage or pipework problems. We assess the exposed areas before deciding how to prepare them for the new installation.
If an unexpected condition requires additional work, we explain the issue, proposed solution and effect on cost or timing before proceeding.
5.3Preparing plumbing and drainage
A good layout must also work with the existing building.
Preparing plumbing and drainage
A good layout must also work with the existing building.
Water supplies and drainage are prepared for the agreed layout. We assess accessible pipework, connections, routes and available falls towards the building drainage system. Suitable checks are made before connections are concealed.
Moving fixtures can require work beneath the floor or within walls. The available drainage height also determines whether a low shower tray or level-access tiled shower is achievable.
Tell us about slow drainage, smells, gurgling or water rising into the shower when a kitchen sink, washing machine or dishwasher empties. We assess the accessible arrangement and identify whether further investigation or alterations are needed.
In some flats, different drains meet before reaching the stack. We check how traps and shared connections are arranged, rather than assuming an existing arrangement is suitable. Problems involving other rooms or communal drainage may need separate work and agreement.
Shower trays, screens & drainage5.4Preparing lighting, ventilation and heating
The practical details are planned before surfaces are closed.
Preparing lighting, ventilation and heating
The practical details are planned before surfaces are closed.
We coordinate requirements for the selected lighting, mirror, extractor and any electric heating. Positions are considered around everyday use: clear light at the mirror, general lighting and optional softer lighting.
Electrical work is carried out by the appropriate qualified professional, with equipment and protection selected for the bathroom and applicable Spanish requirements.
We assess existing ventilation. Where improvements need specialist work outside the agreed bathroom scope, we explain the options and associated costs.
Bathroom lighting5.5Creating sound walls and floors
A carefully finished surface needs a suitable foundation.
Creating sound walls and floors
A carefully finished surface needs a suitable foundation.
We prepare stable surfaces with the flatness required by the chosen tiles. Depending on the existing construction, this can involve removing loose material, repairing or levelling surfaces, or fitting a suitable board system.
Wall-mounted furniture, concealed cistern frames and other fittings need suitable supporting construction and fixings. These are planned before tiling.
Insulated tile-backer boards may form part of the specification where appropriate. Their suitability depends on construction, moisture conditions and available space.
Wall preparation5.6Waterproofing the shower area
The protection lies beneath the visible tiles and grout.
Waterproofing the shower area
The protection lies beneath the visible tiles and grout.
We install the selected waterproofing system to suit the construction and shower arrangement. Corners, joints, penetrations, niches and connections to trays or drains receive particular attention.
Membranes and waterproof board assemblies are completed using compatible components and the manufacturer’s installation details. Waterproof board alone does not seal every joint or fixing.
Required drying, curing and checks are allowed for before the system is covered.
5.7Setting out and installing the tiles
Alignment, proportions and cuts are considered before fixing.
Setting out and installing the tiles
Alignment, proportions and cuts are considered before fixing.
We set out tiles around the shower, furniture, niches, doorways and visible edges. Joint lines and cuts are planned for a balanced finish.
The adhesive, installation method and joint widths suit the tiles and substrate. Patterns, handmade tiles and large formats receive the setting-out and preparation they require.
Movement joints and flexible junctions are incorporated where needed. Adhesives and grout are allowed to cure according to the products and site conditions.
Tile joints & finishing details5.8Fittings, finishing and installation checks
The bathroom comes together, with time for the finishing details.
Fittings, finishing and installation checks
The bathroom comes together, with time for the finishing details.
We complete the installation of the agreed furniture, sanitaryware, taps, shower fittings, screen, mirror and accessories. Trays, baths and concealed components may be installed earlier where the system requires it.
We finish the relevant sealed junctions and agreed decorating, then check alignment, operation and visible details. Once products have cured sufficiently, water connections and drainage are checked; electrical checks are completed by the responsible professional.
The renovated bathroom and agreed access areas are cleaned before the final review and handover.
Allowing the work to set properly
Some stages need time even when no one is visibly working. Preparation products, waterproofing, adhesive, grout and sealants each have their own requirements. We account for these in the schedule and explain when your shower and other fittings can be used.
Ready for your final review.
We review the completed bathroom with you, record any outstanding details and agree how they will be resolved. Relevant product information, care instructions and the documentation agreed for your project are handed over.
What can affect cost or timing?
Hidden damage, unsuitable existing surfaces, relocated drainage, specialist work, product delays or changes to your selections can affect the project. We discuss the implications and agree additional work before it proceeds.
Guarantee & aftercare
The care continues after handover. Your quotation will include written guarantee terms, and you can contact us about any concerns with the completed work. The duration and detailed conditions are being finalised for this preview.
Guarantee & aftercare →A few practical questions
Can I supply my own tiles and furniture?
Yes. We check suitability, quantities, dimensions and delivery arrangements before agreeing the installation. Your quotation identifies what you supply and what Morfohouse provides.
Can I keep the existing layout?
Often this is a practical way to manage cost. We assess the condition and suitability of the existing installations; retaining positions does not automatically mean retaining every pipe.
How long will the bathroom be unavailable?
This depends on scope, preparation and product curing times. We agree an expected programme and discuss bathroom access before work begins, particularly if it is your only bathroom.
Will there be dust in my home?
Some dust is unavoidable during removal and preparation. Floor protection, professional vacuum equipment, organised waste handling and daily tidying help control it. The agreed cleaning covers the renovated bathroom and access areas.
Your project starts with a conversation.
North, east and west Madrid and nearby towns. Send your location, what you have in mind and your preferred timing.